Berkeley Group | The Exchange Watford
Installation of intumescent fire protection systems using Nullifire-approved products | Fire Safety
- Home Main
- Case Studies
- Berkeley Group | The Exchange Watford
Case Details
Client: Berkeley Group
Project: The Exchange Watford
Tags: Nullifire, fire safety
The Story
At The Exchange, Watford, a major residential development delivered by one of the UK’s leading developers, Berkeley Group, our company provided specialist fire-stopping installation services as part of this large-scale project.
We carefully and responsibly carried out the installation of intumescent fire protection systems using Nullifire-approved products, ensuring that all service penetrations and fire compartmentation details met the required fire safety standards and current regulations.
We are proud to have been part of this significant London-area development, working in collaboration with Berkeley Group, one of the country’s most respected and largest developers. Our work contributed to the overall fire safety strategy of the project through high-quality workmanship, strict adherence to approved methods, and a strong focus on compliance and long-term performance.
All completed works were properly documented to support quality assurance and Operation & Maintenance (O&M) requirements, ensuring clear traceability and lasting safety for the development.
The Result
Our approach ensured: